A STEP-BY-STEP GUIDE TO INSTALLING A TUB

A Step-by-Step Guide to Installing a Tub

A Step-by-Step Guide to Installing a Tub

Blog Article

Book Now

Almost everyone has their own unique theory on the subject of A Step-by-Step Guide to Installing a Bathtub.


Installing A Bathtub
Mounting a bathtub isn't precisely rocket science, however it does call for solid plumbing, woodworking, as well as occasionally, tiling skills. Replacing an old bathtub with a new one is likewise a reasonably hard job. If the old bathtub is readily accessible, the project can move immediately; if you need to open up a wall to remove the old tub as well as place the brand-new bath tub, the job is much harder. In either situation, the task is within a residence handyman's abilities, although you will certainly require a helper to move out the old tub and embeded in the brand-new one. Make sure you have qualified yourself for the job and are comfortable attempting it. Rather than hiring a professional to take over a halfway-completed job, it is much better to consider using one prior to you start. Possibilities are you may need a professional plumber to make tube connections.
This article will help you install a brand-new tub in your shower room if you have actually already purchased a brand-new bathtub and also do not require to alter the plan of your previous water system pipes.
Your tools and also material checklist ought to comprise the following:
  • New Bathtub
  • Hammer

  • Pipeline Wrenches

  • Prybar

  • Shatterproof glass

  • Degree

  • Pliers

  • Flexible Wrench

  • Putty Knife

  • Screwdriver

  • Cold Chisel

  • Tape Measure

  • Pipe Caps


  • Preparing for the Installment


    To start with, the sustaining framework supplied with the bath needs to be fitted (if called for) according to the producer's instructions. Next off, fit the faucets or mixer to the tub. When fitting the faucet block, it is essential to see to it that if the faucet includes a plastic washer, it is fitted in between the bathroom as well as the faucets. On a plastic bath, it is also reasonable to fit a sustaining plate under the taps unit to stop stress on the bathtub.
    Fit the adaptable faucet connectors to the bottom of the two faucets making use of 2 nuts and olives (often provided with the tub). Fit the plug-hole outlet by smearing mastic filler round the sink outlet hole, and after that pass the electrical outlet with the hole in the bathroom. Make use of the nut supplied by the manufacturer to fit the plug-hole. Check out the plug-hole outlet for an inlet on the side for the overflow pipeline.
    Next, fit completion of the versatile overflow pipe to the overflow electrical outlet. After that, screw the pipeline to the overflow face which must be fitted inside the bath. Make certain you utilize every one of the supplied washers.
    Link the trap to the bottom of the waste electrical outlet on the tub by winding the thread of the waste electrical outlet with silicone mastic or PTFE tape, as well as screw on the catch to the outlet. Link the bottom of the overflow tube in a comparable manner.The bath must now prepare to be fitted in its last position.

    Removing Old Touches


    If you need to change old taps with brand-new ones as a part of your installation, after that the first thing you should do is separate the water. After doing so, turn on the faucets to drain pipes any water staying in the system. The process of eliminating the existing faucets can be rather bothersome due to the limited access that is commonly the case.
    Use a container wrench (crowsfoot spanner) or a tap tool to reverse the nut that connects the supply pipelines to the faucets. Have a fabric prepared for the continuing to be water that will certainly originate from the pipes. Once the supply pipelines have actually been eliminated, utilize the exact same device to loosen up the nut that holds the faucets onto the bath/basin. You will require to quit the single taps from transforming during this process. As soon as the faucets have been eliminated, the holes in the bath/basin will certainly have to be cleaned up of any kind of old securing substance.
    Before proceeding to fit the new faucets, contrast the pipe connections on the old taps to the brand-new faucets. If the old taps are longer than the new faucets, after that a shank adapter is required for the new taps to fit.

    Mounting the Bathtub


    Utilizing both wood boards under its feet, place the bathtub in the needed setting. The wood boards are helpful in uniformly spreading the weight of the tub over the area of the boards rather than concentrating all the weight onto 4 tiny points.
    The next goal is to make sure that the bath tub is leveled all round. This can be attained by checking the level and adjusting the feet on the bathtub up until the level checks out degree.
    To set up faucets, fit all-time low of the outermost adaptable faucet port to the proper supply pipeline by making a compression sign up with; then do the exact same for the other tap.
    Turn on the water system as well as inspect all joints as well as brand-new pipework for leakages as well as tighten them if needed. Load the bath tub as well as additionally examine the overflow electrical outlet and also the regular electrical outlet for leakages.
    Lastly, take care of the bathroom paneling as described in the manufacturer's instruction manual. Tiling and also sealing around the tub ought to wait up until the bathtub has been used at least once as this will certainly settle it into its final position.

    Suitable New Touches


    If the tails of the brand-new faucets are plastic, then you will need a plastic connector to avoid damage to the thread. One end of the connector fits on the plastic tail of the faucet as well as the other end provides a link to the current supply pipelines.
    If you need to fit a monobloc, then you will call for lowering couplers, which attaches the 10mm pipe of the monobloc to the conventional 15mm supply pipe.
    Next off, place the faucet in the installing opening in the bath/basin making certain that the washers are in area in between the faucet and also the sink. Protect the faucet in position with the maker offered backnut. As soon as the faucet is securely in position, the supply pipes can be attached to the tails of the taps. The taps can either be linked by using corrugated copper piping or with regular faucet ports. The former kind needs to be linked to the tap finishes initially, tightening just by hand. The supply pipelines can later on be linked to the other end. Tighten up both ends with a spanner after both ends have been attached.

    Tiling Around the Tub


    In the location where the bathroom meets the floor tile, it is required to seal the accompanies a silicone rubber caulking. This is essential as the installation can relocate enough to split a rigid seal, creating the water to permeate the wall surface in between the bath and also the tiling, resulting in difficulties with dampness and also possible leaks to the ceiling listed below.
    You can select from a selection of coloured sealers to blend in your components as well as installations. They are offered in tubes and also cartridges, as well as are capable of sealing voids as much as a size of 3mm (1/8 inch). If you have a larger space to fill, you can fill it with spins of soaked paper or soft rope. Remember to constantly fill the tub with water before sealing, to enable the activity experienced when the tub remains in usage. The sealant can split fairly early if you do not think about this movement before securing.
    Alternatively, ceramic coving or quadrant ceramic tiles can be made use of to edge the bathroom or shower tray. Plastic strips of coving, which are easy to use and also cut to dimension, are also quickly readily available on the market. It is advisable to fit the ceramic tiles making use of water-resistant or water resistant glue as well as cement.

    Bathtub Installation


    How Important Is A Bathtub To Your Home?


    High-quality baths, showers, and other bathroom updates are necessary when considering a smart investment in your home. It’s a room that you go to every day and one that is constantly being used by guests.The bathroom is one of the top trafficked rooms in a home and also one of the most valuable in terms of home resale.


    Install Piping Before Tub


    You will be using your existing drain and waste vent system, but pipes required include the hot and cold water supply lines and a pipe leading to a shower head. A mixing valve and shower head are also needed. Air chambers may be required.


    Position the Tub


    Lower the tub into place so that the continuous flange fits against the wall studs and rests on 1’x4' or 2’x4' supports. Anchor the tub to the enclosure with nails or screws inserted through the flanges into the studs.



    NOTE: Remember, bathtubs and shower stalls may require support framing. A bathtub filled with water is extremely heavy, so check building codes and framing support before installing the tub.


    Assemble Drain Connections


    Assemble the bathtub drain connections by connecting the tub overflow with the tub drain above the trap, not beyond it. The trap will have a compression fitting that screws over the arm of the overflow assembly.


    Place a Pipe For the Shower Head


    First, locate a brass female threaded winged fitting and attach it to a framing support via a screw or a nail. Then run a pipe up the wall for the shower head. Sweat or solder the other side of the brass fitting to the top of the pipe.


    Attaching Hot and Cold Water Lines


    Attach your water lines for both hot and cold by sweating these directly into the hot and cold ports of the mixing valve. The mixing valve will be how water enters the tub’s system, not by the pipes themselves.


    Install the Spout


    Extend a piece of 1/2 inch pipe, or whichever length is specified in the manufacturer’s instructions, for the tub spout. Sweat on a male threaded fitting at the end of the pipe or use a brass nipple of the proper length and a 1/2 inch cap.



    NOTE: At this point you should have your rough-in plumbing work inspected before proceeding further.


    Check For Leaks


    Restore the water pressure and check the drain connection and the supply pipes for any sign of leaking.


    estore the Bathroom Wall


    Replace the wall with moisture-resistant drywall as a base for your wall covering. Seal the joints between the wall and your new tub with silicone caulk as protection against water seepage.

    https://www.berkeys.com/2016/12/02/bathtub-installation-dallas/


    Tools You Need to Install a New Bathtub

    I'm very intrigued by A Step-by-Step Guide to Installing a Bathtub and I hope you appreciated the entry. Enjoyed reading our blog entry? Please share it. Let others locate it. I take joy in reading our article about A Step-by-Step Guide to Installing a Bathtub.




    Request Free Estimate


    Report this page